Discover jobs

Sort by: Relevance

Technical Program Manager, Construction Quality

Google (22 jobs)

Saint-Ghislain

Minimum qualifications: Bachelor's degree in Civil, Electrical, Mechanical or Industrial Engineering, Architecture, Organizational Design, Construction management related field or equivalent...

  • Bachelor, Master
  • Junior, Medior
  • Werktuigbouwkunde, Bedrijfskundig Management, Industrial Engineering, study Telecom, Techniek
  • Facilitaire dienstverlening, Internet, Datacenter
  • Latest update: 4/2/2025

Technical Program Manager, EHS Design

Google (19 jobs)

Brussels

Minimum qualifications: Bachelor's degree in a technical field, or equivalent practical experience. 5 years of experience in program management. 5 years of experience with environmental health and...

  • Bachelor, Master
  • Medior
  • Werktuigbouwkunde, Industrial Engineering, Mechanical Engineering, Techniek
  • Facilitaire dienstverlening, Internet, Datacenter
  • Latest update: 4/2/2025

Senior Technical Program Manager, Data Center Delivery

Google (5 jobs)

Amsterdam

Note: By applying to this position you will have an opportunity to share your preferred working location from the following: Amsterdam, Netherlands; Munich, Germany; Dublin, Ireland; London,...

  • Bachelor
  • Senior
  • Werktuigbouwkunde, Bedrijfskundig Management, Electrical Engineering, Mechanical Engineering, Techniek
  • Facilitaire dienstverlening, Internet, Datacenter
  • Latest update: 4/2/2025

Senior program manager system delivery NPI dry

ASML (12 jobs)

Veldhoven, Netherlands

Introduction to the jobASML is one of the world’s leading manufacturers of chip-making equipment. We are renowned for our state-of-the-art high-tech innovations. The new Sr. Project Manager works...

  • TU
  • Medior, Senior
  • Bedrijfskundig Management, Industrial Engineering, Supply Chain Management, Techniek
  • Halfgeleider industrie, Machinebouw, Maakindustrie, Semiconductor
  • Latest update: 4/2/2025

1 - 4 of 4 jobs

Register

Register

Enjoy the benefits along with 100.000 other candidates

Ontdek 4 vacatures Program Manager

Vind passende vacatures Program Manager. Bekijk het grote aanbod banen Program Manager. Geen vacatures van bureaus en direct solliciteren bij werkgevers in diverse branches. Vind je nieuwe baan op Techniekwerkt.